Local:       UTC:

Instrument Procedures / Approach Plates - Bethel Airport

IATA: BET

ICAO: PABE

FAA: BET

US Flag

Traveling to Bethel?


BET Airport Terminal Procedures


FAA Terminal Procedures valid from 0901Z 05/25/17 to 0901Z 06/22/17.

Page Type Page Name Volume Action Since
Last Cycle
APD AIRPORT DIAGRAM AK-1
IAP ILS OR LOC/DME Y RWY 19R AK-1
IAP ILS OR LOC/DME Z RWY 19R AK-1
IAP RNAV (GPS) RWY 01L AK-1
IAP RNAV (GPS) RWY 01R AK-1
IAP RNAV (GPS) RWY 19L AK-1
IAP RNAV (GPS) RWY 19R AK-1
IAP RNAV (GPS)-A AK-1
IAP VOR/DME RWY 01L AK-1
MIN TAKEOFF MINIMUMS AK-1
Terminal Procedures are only available for airports in several countries with more being added all the time. If you are looking for a specific country's charts, please send an email to support(at)airportguide.com stating the country name. This will be used to prioritize the implementation.

BET Airport Diagram

Bethel Airport (BET) Diagram
Do you have a better diagram of this Airport?
Please share it with us.


© 1998-2017 AirportGuide.com. All rights reserved.
AirportGuide.com does not guarantee the accuracy or timeliness of any information on this site. Use at your own risk.
NOT to be used as an official source for flight planning, navigation, or use in flight.
eXTReMe Tracker
AvCanada Topsites List